How about being able to change order(sequence) of the tabs in the persona card?

I did this directly in the code by changing the sequence of the code snippets that render the tabs. But after the next update of the program, I will have to do it all over again. And not everyone will be able to do the same. At the same time, this is a very relevant issue for a small laptop screen.
Maybe this is possible make Drug & Drop there?

1 Like

This topic was automatically closed 30 days after the last reply. New replies are no longer allowed.